WebJan 1, 1997 · These drums are essentially identical in design and construction; however, they are operated significantly different- also indicating that damage is related to operation. Low Cycle Fatigue Low cycle fatigue (LCF) due to cyclic thermal stresses has been identified as the main damage mechanism in coke drums. WebMay 24, 2024 · Coke drum designed according to ASME Sect ion VIII division II pressure vessel with little or no account for the cyclic operation fatigue service in which they operate [1] In general temperature history can be divide into four stages. First is preheating stage from 0 to 440 minutes, second i
Assessment of Coke Drum Materials Based on ASME Material …
WebThe drum operation cycle is typically 48 hours—a coke drum is usually on-stream for approximately 24 hours before becoming filled with porous coke, and the following procedure is used to remove the coke: (1) the coke deposit is cooled with water, (2) one … High-temperature operation is not necessarily the most economic method … WebAug 9, 2016 · During the coke removal process, there is a lot of vibration. The high-pressure water lines used to drill out and cut the coke from the drum internals create pressure in excess of 4,000 psi. The steam and quench water’s rapid expansion and the condensate’s temperature fluctuations often produce water hammer. cuccui gavino langhirano
Crack growth modelling and probabilistic life assessment of coke drums …
Web2. Monitoring system for vibration safety analysis. To understand the change in the dynamic characteristics of the coke drums and to evaluate the vibration safety for all operating processes in the operating state, the schematic diagram of the proposed monitoring system is presented in Figure 1(b).As shown in Figure 1(a), the operation of the system affects … WebDuring operation, a drum is filled with the solid coke until it is filled completely. Since the coking drums are connected to the continuously operating fractionator (distillation column), the reactors are filled and emptied in an alternating fashion. The emptying and preparation procedure consist of the following phases: WebMost existing coke drums were not designed for low-cycle fatigue, which did not become an issue until drums began operating on shorter cycles which increased local stresses above yield causing cracking. Even newer drums have experienced through-wall cracking in as little as 5 years. cuccumella giocatore